Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, 2no. roof windows to the front, new access stairs and flat roof dormer to the rear.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
19, Liffey Place, Lucan, Dublin, K78 E129
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 4,246 nearby planning records within 5 km where a location match is available.
- Matched source
- SD24B/0061
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window and 'Dutch' hip; new access stairs and 2 roof windows to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Retention of a c.40sqm prefabricated garden room/granny flat in the rear garden of home.
Erection of new two storey sensory room and bathroom extension over existing ground floor extension to side and rear of house together with the removal of internal load bearing walls on ground floor and insertion of structural steel supports with modifications to existing layout of house. Also single storey porch extension to front and alterations to front elevation with all associated site and drainage works.
Conversion of existing attic space comprising of modifications of existing roof structure, raising of existing gable c/w window and 'Dutch' hip, new access stairs and flat roof dormer to rear
Source match
Matched from public planning record SD24B/0061The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report