Retention consists of the construction of a rooflight in the main roof to the front of the property.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
17, Edenbrook Grove, Citywest, Co. Dublin, D24 FV1F
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 2,193 nearby planning records within 5 km where a location match is available.
- Matched source
- SD24B/0297W
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The development seeking permission will consist of the construction of one dormer window in the main roof to the rear, one rooflight in the main roof to the front of the property and one window in the gable (south) elevation.
Retention consists of the construction of two rooflights in the main roof to the front of the property.
Retention of 1 Totem Sign Unit, complete with all associated site works.
1 x 50 KWp solar photovoltaic (PV) will consist of 154 PV panels on the warehouse roof and will occupy an area of 254sq.m.
Development of 459 dwelling units 294 apts 1,2, 3, bed and studio apts (ranging from 39sq.m to 112sq.m) arranged in 7no. 4 to 6 storey apartment blocks (Blocks A1 to A3, B1to B3 and Block C1) 123 houses 3 and 4 bed terraced and semi-detached 2 and 3 storey houses (ranging from 112sq.m to 137.5sq.m) and 42 2 and 3 bed, 3 storey duplex units (ranging from 78sq.m to 118sq.m) & all associated public open spaces comprising landscaped courtyards and communal amenity spaces and private amenity spaces comprising gardens and terrace/balconies. The proposed apartment blocks are arranged over single level basement. Vehicular access to serve the proposed development will be provided from a proposed new central section of Citywest Avenue including replacement of the existing roundabout with a priority junction within the subject lands with associated tie-links linking to the existing northern section of Citywest Avenue located at the north eastern boundary of the site extending to the existing roundabout on the Citywest Road (N82) and the existing / under construction southern section of Citywest Avenue within Cuil Duin development (Reg Ref SD15A/0095) to the west 3no additional vehicular access points are proposed including 1 to connect to the permitted Cuil Duin development (Reg Ref SD15A/0095) to the west 1no connecting to the permitted development to the east (Reg Ref SD16A/0210) 1 connecting to the permitted development to the south east (SD16A/0078). The Current application includes a temporary pedestrian link to Fortunestown Luas Stop at the south eastern corner of the site which will be operational until such time as a permanent link is provided via the permitted development to the east (Reg Ref SD16A/0210). Permission is also sought for a crèche facility of 327sq.m with associated external play area of 275sq.m within Block B3, a resident's communal room of 127sq.m within Block B1, 482 car parking spaces including 130 car parking spaces at basement level below Blocks A1 to A3 and 352 surface level car parking spaces, 588 bicycle parking spaces, bin storage areas, ESB substations, public lighting, boundary treatments, surface water infrastructure and all associated site development and infrastructure works.
The full report covers all 2,193 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD24B/0297WThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report