Applications tied to the site
Partial coverage27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 2,831 decisions within 5 km, 27 exact-site or onsite candidate records, and 888 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
27 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
27 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
888 structured nearby appeal records.
888 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Proposed build-up of existing hip in roof to side of roof into Dutch hip at attic level, with window in proposed gable wall. Dormer roof window on rear slope of roof all at attic level. Proposed attic conversion.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear. Construction of single storey extension to the side comprising of bedroom c/w en-suite and utility room and all associated site works.
Construction of a part double, part single storey pitched roof extension to the side/rear.
Attic conversion to include the reconfiguration of the side roof profile from hipped to Dutch half hipped and to include a dormer window structure within the front roof slope and rear roof slope, and rooflights within the front roof slope
Construction of two pitched dormer extensions to rear and side of existing roof & attic space for study/storage use, a new frosted window to side gable and 1 new window to rear dormer extension.
The conversion of existing attic space comprising of modifications of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear of the property at 8 Johnsbridge Grove, Esker South, Lucan, Co Dublin
The brief summarizes the pattern across all 2,831 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD24B/0301The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.