The development will consist of the following: The construction of a new dormer window in the roof and extension to the side of the existing dwelling to form a new en-suite bathroom at first floor level. The development is to include for the installation of rendered external wall insulation to the existing elevations, 1no. rooflight on new dormer, internal alterations, drainage and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
105, Hillcrest Drive, Lucan, Co. Dublin, K78 V1W7
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 2,228 nearby planning records within 5 km where a location match is available.
- Matched source
- SD24B/0501W
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
(i) Retention permission for 'Click and Collect' signage in the existing Tesco car park; and (ii) permission for the construction of a sheltered canopy (c50 sq.m) in the existing car park for the purpose of providing 2 dedicated ''Click and Collect' spaces for the existing Tesco store and all associated site development works.
The development will consist of the construction of a single- storey extension to the front of the property and all associated site works.
Change of use from hair dressing salon to coffee shop and to alter existing shop front.
Construction of link element to join the existing detached single storey house to the detached garage; conversion of same garage to residential use.
Amalgamation of shop units 1A and 1B to form a coffee shop; associated signage; northwest elevation to consist of new shop frontage with new 7.4m x 1.2m red aluminium fascia; red powder coated goalpost frame around entrance & 6m x 0.55m white colour internally illuminated individual Costa Coffee letters above door; southwest elevation to have 3 new window openings; door opening to have red powder coated goalpost frame around entrance; internally illuminated 1.6m diameter roundel sign and new 19.5m x 1.2m red aluminium fascia with white colour internally illuminated individual Costa Coffee letters 7.5m x 0.65m;
The full report covers all 2,228 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD24B/0501WThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report