Development of site (Containing 0.68 hectare) consisting of container storage area together with ancillary works including vehicular entrance, Parking area, drainage, Fencing and landscaping works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Merrywell Industrial Estate, Ballymount Road Lower, Dublin 12
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 6,108 nearby planning records within 5 km where a location match is available.
- Matched source
- SD25A/0028
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Detached industrial unit comprising 960sq.m of workshop area plus 720sq.m stores/offices/staff facilities on two floors totalling 1680sq.m together with hardstanding area, diesel storage tanks, wash bay facilities, site boundary walls/fencing and all associated site development works.
Part off-licence use in existing retail unit.
1) The expansion of the existing Warehouse facility through the construction of a 2320m2 x 1Sm high single storey structure to the West of and adjoining the existing facility. This extension shall house ambient and temperature controlled storage zones and shall be served by three Articulated Vehicle loading docks on its Northern elevation as well as on grade loading doors on the Western Elevation. The building shall be clad in plastisol coated insulated metal cladding and shall house solar panels on its roof. 2 )The rationalisation of the existing delivery vehicle loading area through the expansion of the existing loading docks on the Northern elevation measuring 536.28m2 x 6.9m high and containing individual Rigid vehicle loading docks. The building shall be ct4 in plastisol coated insulated metal cladding. 3) The extension of the existing yard area on the Western side of the site to accommodate Vehicle loading and the relocation of the existing Compactor Building and workshop to the South West comer of the site 4) The extension of the existing Staff and Visitor car park on the Eastern side of the site 5) Alteration to Boundary treatment to Robinwood Road through the realignment of the existing wall and the installation of a new pedestrian and bicycle access at the North West Comer of the site. 6) The installation of two levels of new fenestration to the Eastern Elevation of the existing building. 7) The installation of a new underground surface water attenuation system beneath the new Western yard complete with petrol interceptor and hydro brake to augment the existing site systems.
Upgrade and alterations to two separate existing entrances on Turnpike Road and Ballymount Road. The development will consist of: (a) Turnpike Road entrance - the installation of new paving, dished curbs and tactile paving to facilitate pedestrian crossing, the removal of part of existing metal railings and metal palisade fence, the installation of textured block wall to match existing textured block wall, installing a new sign and the erection of two textured block columns topped with new signage; (b) Ballymount Road entrance - the installation of new paving supporting the existing tactile paving to existing pedestrian crossing, the removal of existing timber fence and metal palisade fence, the installation of textured block wall, installing a new sign and the erection of two textured block columns topped with new signage and all associated site development works.
Installation of new paving; removal of existing timber post and rail fence; installation of textured block walls incorporating new signage; erection of two textured block columns topped with new signage; all associated site development works.
Source match
Matched from public planning record SD25A/0028The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report