The development of a Regional Network Gateway (RNG) facility (supporting infrastructure for the MS data centres) comprising the following: • Construction of a single storey main building (RNG Building - c.1,124.3 sq.m) with air handling units (AHUs). • External plant/equipment yards including 3 no. diesel generators; sprinkler tank and pump house; electrical plant rooms, PV panels. • MV substation & Stormwater attenuation pond. • 12 no. car parking spaces (2 of which are EV parking spaces and with 1 accessible parking space). Bike parking shelter and bin store. • New road access provided from adjoining permitted estate road (granted under SDCC Ref. SD24A/0107W) and including bridge over existing watercourse. • Internal road and footpath layout, perimeter fencing, security gates and retaining wall. • Landscaped and planted areas including riparian corridor and swale. • Temporary Construction compound and parking area (including temporary bridging of existing watercourse/field drain). • All associated site development works, site lighting, boundary treatments, services/utilities provision (including underground works), and all other ancillary works. Total gross floor area of the development c.1,384.2 sq.m
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands at Castlebaggot, in the townland of Kilmactalway, Newcastle, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 2,269 nearby planning records within 5 km where a location match is available.
- Matched source
- SD25A/0035W
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The proposed development seeks to provide a temporary construction access road including entrance from Baldonnel Road to provide for the construction of a Regional Network Gateway (RNG) facility permitted under South Dublin County Council Reg. Ref. SD25A/0035W. The works will also involve the temporary provision of a security hut, security gate, vehicle set down area, associated fencing, lighting, civils, drainage, and landscaping works. The temporary works will be removed and lands reinstated to their former use when the construction of the RNG facility is complete.
Retention of existing single storey buildings being used as Creche to the side/rear of the original Castle Bagot House building (a Protected Structure) on site and all associated site installations.
Development at this site on lands that include the Aylmer Road (L6003); Baldonnel Road (L2001); and lands that include a small section to the north, but are primarily to the south, of the Aylmer Road, including part of the Griffin allotments, within the townland of Kilmactawlay and Milltown, Newcastle, Co. Dublin consisting of the widening, to its south, of the existing Aylmer Road (L6003) from its junction with the Baldonnel Road (L2001) for a distance of c. 520m to the west. The widened road will tie in with the existing road to the west of a proposed new roundabout. The new roundabout will be created by utilising lands to the north and south of Aylmer Road to facilitate access to a new internal estate road (270m in length) to its south-east with a new roundabout at its end that will provide future access to the lands to its north and south. The widening of the Aylmer Road to a 7.5m wide carriageway will be almost entirely to its south and will include a proposed new shared cycle path and pedestrian footpath along its southern side, with the existing hedgerow to be retained for large lengths, and a new hedgerow to be planted where the existing one is to be removed. The proposed new shared cycle and footpath will tie in with a proposed new footpath and cycle path that will be located either side of the new internal estate road. These works will include the provision of 2 new dry attenuation basins on the south side of the widened road. The development will include all ancillary infrastructural works, street lighting, site development and ground works, including fencing, signage, and landscaping.
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Source match
Matched from public planning record SD25A/0035WThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.