The development will consist of the construction of a new mezzanine floor to the warehouse area for storage use (641m2) and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 21, Fonthill Business Park, Fonthill, Dublin 22, D22 FR82
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 4,317 nearby planning records within 5 km where a location match is available.
- Matched source
- SD25A/0056W
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Change of use of existing storage area over first floor level to ancillary office use (241 sq.m) to include revisions to front (east elevation) and side (north elevation) to provide for a new windows at second floor level and internal alterations to allow proposed second floor to be accessed.
Conversion of attic space to play room and toilet to include construction of vertical extension to gable wall and reallignment of roof; construction of dormer to rear of dwelling; new internal stairs and associated works; all associated works required to construct the works.
Conversion of existing attic space comprising of modification of existing roof structure; raising of existing gable c/w window and 'Dutch' hip and new access stairs.
Planning permission is sought for the following: (1) Conversion of existing attic space comprising of modification of existing roof structure, raising the existing gable, new access stairs and flat roof dormer to the rear.
Pitched roof garden room/store to rear.
The full report covers all 4,317 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD25A/0056WThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report