The construction of a 250m2 mezzanine floor extension within an existing warehouse building, and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 6A, Broomhill Business Complex, Broomhill Road, Tallaght, D24FR64
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 5,248 nearby planning records within 5 km where a location match is available.
- Matched source
- SD25A/0178W
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Retention of change of use from industrial/warehouse use to office use at ground (426sq.m) and first floor (399sq.m.).
Change of use of premises from offices and showrooms to health club and for sign on south façade of building.
Retention of 3 first floor offices and a mezzanine floor for storage purposes; free standing detached steel framed; 7 bay open fronted shed at rear.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e. off licence use) within the overall permitted retail unit; off licence floor area 8sq.m and is ancillary to the primary retail use.
(1) Alterations to front and side elevations of existing industrial unit to include a new canopy entrance and external finishes; (2) new vehicular entrance off Broomhill Road to provide for new parking arrangement and all associated site works.
The full report covers all 5,248 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD25A/0178WThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report