The development will consist of alterations to the existing east elevation to include the provision of a new external fire escape stairs to facilitate the internal subdivision of the existing office building, together with all associated site and ancillary works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
3030, Lake Drive, Citywest Business Campus, Dublin 24, D24KX6Y
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 2,394 nearby planning records within 5 km where a location match is available.
- Matched source
- SD25A/0185W
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The installation of an external Air Handling Unit, to be housed in a new timber and metal clad enclosure adjacent to Unit 3030, Lake Drive and the installation of a Heat Pump Unit to be installed within an existing plant enclosure, with additional cladding proposed, in the north east corner of the carpark of Unit 3030 and all ancillary engineering and landscape works necessary to facilitate the development at Unit 3030 Lake Drive, Browns barn, Dublin 24 D24 KX6Y. (Previous planning reference SD25A/0185W )
Alterations to existing east and west elevations to include 10 external vents; installation of new photovoltaic solar panels to existing roof; provision of 10 bicycle parking spaces; 2 EV chargers; 1 external condenser and all associated site works.
The development will consist of erection of back-lit signage to the west elevation of Unit 3018.
1 x 50 KWp solar photovoltaic (PV) system on main office building. There will be a total of 156 PV panels on the main office roof and will occupy an area of 257sq.m.
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.
Source match
Matched from public planning record SD25A/0185WThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report