Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 10,387 decisions within 5 km, 22 exact-site or onsite candidate records, and 2987 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
22 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
22 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2987 structured nearby appeal records.
2,987 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
The proposed development will consist of high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 8no. electric vehicle charging bays with 8no. Tesla illuminated charging units and associated signage, II. Installation of proposed Tesla supercharger power cabinet equipment, III. Installation of proposed modular substation, IV. Erection of associated EV signage, V. All associated site development works including line marking.
The development will consist of: Continued use of the building as a garden centre to include minor internal alterations. The erection of a twin arched external canopy structure over the garden centre yard to the rear. The erection of a single arched external canopy structure over the access ramp to the lower ground floor. Retention of the continued use of the lower ground floor as a garden centre retail space. All associated site works and services.
Extensions and alterations to the existing dwelling, including the construction of a 2 storey extension to the side (this in part an extension above existing single storey building), a single-storey extension to the rear, and a dormer roof to the rear at 2nd floor/attic level to provide non-habitable attic room. Internal alterations at ground and first floor level. Alterations to the front elevation will consist of the relocation of the entrance, removal of 1 window and addition of 1 window.
Removal of existing garage to side, construction of two storey extension to side, single storey extension to rear of existing dwelling with rooflight and all associated site works.
Installation of roof mounted solar photovoltaic panels to include all ancillary works and services.
Attic conversion for storage use including a dormer window and two rooflights to the front roof slope, a dormer window to the rear roof slope, and a new gable window.
The brief summarizes the pattern across all 10,387 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD25A/0219WThe site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief