Applications tied to the site
Partial coverage21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 6,019 decisions within 5 km, 21 exact-site or onsite candidate records, and 1867 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1867 structured nearby appeal records.
1,867 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Two side-facing Velux windows on the front dormer and a Velux window on the front roof slope. New front-facing fenestration on the front dormer. A new dormer to the rear at attic level. A flat-roof single storey extension to the rear.
Conversion of attic with consequential alterations to existing rear roof to include a contemporary dormer to create a habitable bedroom with ancillary works.
Construction of a single storey one bedroom dwelling attached to the existing dwelling with new vehicular entrance to both existing and proposed dwellings; new boundary walls and all associated works.
15 residential units comprising: 2 two storey, four bed detached houses, 5 two storey, three bed mid-terraced houses, 8 two storey, three bed semi-detached/end-terrace houses along with all associated car parking, landscaping and site development works. A new footpath and public lighting to Ballymount Road is proposed. The development will result in a new pedestrian/cyclist connection through to Ballymount Park.
A) Retention permission for the retention of the existing 45m high monopole telecommunications support structure together with all associated antennas, dishes, RRU’s, cabling and equipment to include ground based equipment all enclosed in security fencing. (Permission previously granted under SD12A/0152 on a 5 year temporary permission) and B. Permission for the addition of support steelwork at the top section of the 45m high monopole telecommunications support structure to accommodate ComReg receive antennas, dish, and radio receiver together with associated works bringing the overall equipment height to 48.44m (49.45m including lightning finial)
The installation of a 1.81m x 1.42m x 0.51m (H x W x D) gas pressure reduction unit with all ancillary services and associated site works.
The brief summarizes the pattern across all 6,019 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD25B/0060WThe site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief