Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 4,568 decisions within 5 km, 6 exact-site or onsite candidate records, and 1513 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1513 structured nearby appeal records.
1,513 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Change of use of existing 20 sq./m garage to habitable space and construction of a 27.7 sq./m single storey extension to the rear of existing dwelling.
Retention for a first floor rear extension with flat roof over for extended bathroom space; Permission for a dormer roof window to rear roof profile and a single storey ground floor rear extension with flat roof over for extended kitchen space.
The development consists of a two storey rear extension with tiled roof, 2 bedrooms bathroom, roof lights, open plan ground floor living area with internal alterations and all associated site works.
(i) Demolition of former filling station comprising derelict forecourt canopy (150.35sq.m), single storey vacant retail structure (76.77sq.m) and ancillary building (99.64sq.m); (ii) construction of a flat-roofed, four storey contemporary-style apartment building (2376.73sq.m) including set-back third floor level consisting of 22 apartments (8 one-bedroom and 14 two-bedroom) with private terraces/balconies. (iii) The development will also include an area of communal open space (c.1420sq.m), 24 car parking and bicycle parking spaces, and bin storage; (iv) provision of new landscaped section to Monastery Road to include planting and 1.5m. high wall and railing boundary treatment with vehicular and pedestrian entrance and piers; (v) SuDS drainage; (vi) landscaping and boundary treatments; and, (vii) all associated site works necessary to facilitate the development.
Alterations to previously approved development, Reg. Ref. SD17A/0291 (An Bord Pleanála Ref. ABP-301369-18), comprising the following: (i) deletion of a service room to the rear of the ground floor; (ii) provision of 2 additional one bedroom units and plant rooms at ground floor level to the rear of the building; (iii) provision of an additional floor level between the second and third floor of the previously approved four storey apartment building to provide an additional 1 one bedroom unit, 3 two bedroom units and 1 three bedroom unit resulting in a five storey, 26 unit apartment building; (iv) increase of floor area of apartment No. 26 by 6.5sq.m located on the fifth floor; (v) amendments to previously approved boundary treatment to provide for a rendered wall with capping stones; (vi) provision of 5 additional car parking spaces resulting in a total of 29 car parking spaces; (vii) amendments to site layout to facilitate the re-location and addition of bicycle parking spaces to provide a total of 36 bicycle spaces to the western boundary and re-location of bin store from the western boundary to the northern boundary of the site; (viii) all ancillary works necessary to facilitate the development.
Alterations to approved development Reg. Ref. SD17A/0291 (An Bord Pleanala Ref. ABP-301369-18) comprising: Retention of (i) deletion of a service room to the rear of the ground floor; (ii) minor extension of bedroom 1 of apartment No. 8 (located on the first floor) by 4.5sq.m. and reconfiguration of associated balcony; (iii) provision of 2 additional one bedroom units and new plant room at ground floor level to the rear of the building; Permission is sought for (i) minor extension of the living room and bedroom 1 of apartment No. 21 (located on the third floor) by 7sq.m and reduction of associated balcony by 7.1sq.m; (ii) amendments to previously approved boundary treatment to provide for a rendered wall with capping stones along Monastery Road; (iii) alteration of approved car parking to provide 5 additional car parking spaces resulting in a total of 29 car parking spaces; (iv) amendments to the approved site layout to facilitate the re-location and addition of bicycle parking spaces to provide a total of 36 bicycle spaces to the western boundary and re-location of bin store from the western boundary to the northern boundary of the site; (v) all ancillary works necessary to facilitate the development.
The brief summarizes the pattern across all 4,568 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD25B/0225WThe site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief