Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 4,357 decisions within 5 km, 7 exact-site or onsite candidate records, and 1158 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1158 structured nearby appeal records.
1,158 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
New flat roof dormer to the rear of the existing house roof. The top of the flat roof dormer to be 400mm above the existing house ridge line. A new Velux to the front of the existing house roof and all ancillary works.
Remove section of existing grass margin and extend concrete apron to rear of existing public footpath and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each 2.0 square metre area.
The development will condsist of an attic conversion extending existing ridge level to accomadate proposed bedroom and associated works
Construct a new 2 storey rear extension to existing Elverys Sports retail unit including 2 no. new EV charging spaces and 7 no. cycle parking spaces together with all signage, associated site works, and connection into existing services.
Divide existing Elvery's Sport retail unit into two separate retail units; retaining the larger unit for Elvery's Sports; minor elevational changes; associated signage; site works and ancillary services.
Divide existing Elvery's Sport retail unit into two separate retail units; retaining the larger unit for Elvery's Sports; minor elevational changes; associated signage; site works and ancillary services.
The brief summarizes the pattern across all 4,357 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD25B/0443The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief