The proposed development includes retention permission for the reorientation of the gas AGI (above-ground installation) compound permitted under SDCC Reg. Ref.: SD23A/0158 and to retain an existing Gas AGI skid located to the north of the gas AGI compound. The development also includes the retention and completion of an extension to the existing Gas AGI compound to the south, to provide for a pressure regulating and metering station (PRMS) compound area. The PRMS compound extension comprises the following buildings and gas related infrastructure:•Skid House structure with a total area of c. 118 sq.m and overall height of c.3m. •E&I Kiosk with a total area of c. 11 sq.m and overall height of c. 2.7m •Boiler House comprising 2 no. individual units (Boiler House 1 & Boiler House 2) both with an area of c. 22 sq.m and overall height of c.3m. •Gas Quality Building with a total area of c. 3 sq.m and overall height of c. 2.4.m • All associated and ancillary works including valves and pipework, site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site which is subject to an EPA Industrial Emissions (IE) Directive license.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 4,294 nearby planning records within 5 km where a location match is available.
- Matched source
- SD26A/0004W
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Retention sought for conversion of industrial unit to place of worship/church (456sq.m), new signage and associated works.
Retention sought for conversion of 2 storey commercial unit to place of workship/church (430sq.m.), new signage and associated works.
370sq.m side & rear extension & new entrance.
370sqm side and rear extension, new entrance, and new facade to front elevation.
The provision of alternate entrance and access arrangements from Crag Avenue to serve the permitted data storage centre, energy centre and substation development permitted under Reg. Ref. SD18A/0068, as amended by Reg. Ref. SD19A/0185 including the provision of ducted services connections between the permitted substation on site (permitted under Reg. Ref. SD18A/0068 as amended by Reg. Ref. SD19A/0185) and existing services to the south of the Grand Canal. The proposed ducted services connections will exit the permitted substation compound and run southward, crossing beneath the Grand Canal by way of a horizontal directional drill, before proceeding east and west to connect to existing services located to the south of the Grand Canal. This proposed development is also located on lands within the Grand Canal Corridor to the north of the R134 Regional Road, Clondalkin, Dublin 22.
Source match
Matched from public planning record SD26A/0004WThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report