(i) Demolition of single storey lean-to shed and removal of existing boundary wall to the front; (ii) Construction of a two-storey extension to the front/north, side/west and rear/south of the existing two-storey dwelling with associated internal reconfigurations; (iii) provision of 1 no. rooflight and 2 no. solar panels; (iv) Provision of new boundary walls (1.2m) to the front; and, (v) All ancillary works, inclusive of landscaping, boundary treatments and SuDS drainage, necessary to facilitate the development.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
2, Knocklyon Avenue, Knocklyon, Dublin 16, D16 H3K8
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 6,905 nearby planning records within 5 km where a location match is available.
- Matched source
- SD26B/0032W
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Detached Two storey Three bedroom house with shared entrance to side.
Demolish part of extension to side and construct two storey detached house and vehicular entrance to side.
Two storey detached house and new vehicular entrance.
Detached two storey, three bedroom house with shared entrance to side.
Alterations to previously approved planning application Reg Ref No. SD24A/0034. The proposed alterations affect House B (5A Knocklyon Ave) of the previous application to include a 1st floor extension to the side (circa 6 Sq/M) & a single storey extension to the rear (circa 3 Sq/M) & all associated works
The full report covers all 6,905 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD26B/0032WThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report