Applications tied to the site
Partial coverage36 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
36 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 5,320 decisions within 5 km, 36 exact-site or onsite candidate records, and 1765 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
36 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
36 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1765 structured nearby appeal records.
1,765 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Proposed widening of existing entrance consisting of constructing a new front pier, dish public footpath in line with new entrance and all associated works.
The development will consist of: 1. Removal of the existing rear garden single shed. 2. Removal of front wall carport facade to accommodate the construction of a single storey, pitched roof extension, to consist of an entrance porch and hallway with new stairs. 3. Construction of a new single storey pitched roof rear extension to consist of a kitchen and dining room. 4. Partial raising of the existing roof ridge, front and rear gable walls, to accommodate a new attic conversion (to consist of a bedroom with en-suite) incorporating a tiled pitched roof, with flat roof dormer windows on both side elevations, and a new front facing gable window. 5. General remodel and upgrade of the existing house at all floor levels to accommodate the proposed works 6. All drainage, structural and associated site works.
The development will consist of 1. Demolition of the existing garage/carport wall attached to the existing house. 2. Construction of a single storey flat roof front extension to consist of a porch and utility Room. 3. Construction of a two storey rear extension with gable ended roof to consist of hall, Lounge/Play room, Master bedroom walk in wardrobe and ensuite on the ground floor and two bedrooms, office and bathroom on the first floor. 4 Construction of court yard in the ground floors proposed to the rear extension and the existing house. 5. General remodel and upgrade of the existing dwelling to suit the proposed layouts. 6. All drainage, structural and associated siteworks to be implemented
Permission sought for single storey extensions at front and rear including relocating the front entrance door from the front of the house to the side of the house, the removal of the existing front sitting room window canopy and the installation of 2 Velux rooflights to new rear extension roof and 2 Velux roof lights to existing roof
Construction of a first floor rear extension and all associated site works.
Permission for extension works to the front (14 sqm) and rear (21 sqm) side of the existing 2 storey house Including upgrades to the existing driveway, entrance and rear garden and all associated site works.
The brief summarizes the pattern across all 5,320 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record SD26B/0261WThe site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief