Development on 2 sites separated by the permitted Celbridge Link Road with a total area of 6.36 Ha; The south-western site (5.39 Ha) is generally bound to the east by Celbridge Link Road, to the south and west by undeveloped land and an electrical substation and to the north by the Tubber Lane Development Area. The north-eastern site (0.97 Ha) is generally bound to the east by the undeveloped Primary School site and Aderrig Park Avenue, to the south by Airlie Park Road West and the undeveloped Primary School site, to the west by Celbridge Link Road and the Tubber Lane Development Area and to the north by the Tubermaclugg Village Development Area. This application is being made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to a proposed development within the Aderrig Development Area of the Adamstown Strategic Development Zone; The proposed development will principally consist of: the demolition and removal of derelict hardstanding and walls; and the construction of 207 residential units (64 two bed, 127 three bed and 16 four bed), ranging in height from 2 storeys to 4 storeys, comprising 75 houses (59 three bed and 16 four bed) and 132 duplexes (64 town bed and 68 three bed); The development will also include: vehicular junctions to access the development from Celbridge Link Road (2 No.) and Adamstown Way (3No.); internal road, cycle and footpath network; 314 car parking spaces; cycle parking; bin storage areas; public, communal and private open space areas, with balconies and terraces facing all aspects; hard and soft landscaped areas; boundary treatments; public lighting; 2 sub-stations; and all associated site and development works above and below ground.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
In the townland of Aderrig, Adamstown, Lucan, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 1,556 nearby planning records within 5 km where a location match is available.
- Matched source
- SDZ22A/0014
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Construction of a ground floor extension, conssting of a playroom and bedroom with ensuite, to rear of existing house.
Development of 227 dwellings (24,513.8sq.m gross floor area); 95 3-bed, 2 storey terraced houses and associated gardens; 28 4-bed, 3 storey terraced houses and associated gardens; 48 3-bed, 2 storey duplex apartments over 48 2-bed apartments (3 storey buildings with 2 storey duplex over single level ground floor unit) and associated communal and private open space; 4 3-bed, 2 storey duplex apartments over 4 3- bed, 2 storey duplex apartments (4 storey buildings with 2 storey duplex over 2 storey duplex) and associated communal and private open space; all associated site and development works including roads, central public open space (0.12ha), car parking (361 spaces), bicycle parking (168 spaces), bin storage areas, 2 ESB substations (22sq.m), associated pedestrian footpaths and cycle paths, hard and soft landscaping and boundary treatment. A section of the East - West Avenue Road (referred to as Airlie Park Road) along the northern boundary of the site is included in the current application and 2 access points are proposed to this road; development is accessed from roads already approved or under construction. The road to the south (referred to as Adamstown Way) was permitted under SDZ06A/0005 and bounds the site to the south and 1 access point is proposed to this road. 4 access points are proposed to the east and west (2 each). The Celbridge Link Road permitted under SDZ17A/0009 bounds the site to the west and the north-south road to the eastern boundary (referred to as Linear Park Road) was permitted under SDZ20A/0017. 17 spaces were permitted under SDZ17A/0009 providing a total of 378 spaces for this development.
Proposed development within Area 8 of the Adamstown Strategic Development Zone comprising part change of use of existing dwelling to allow a crèche (46.5 sqm) to operate from the premises for a temporary period of five years, involving minimal internal alterations at first-floor level.
The application is being made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to proposed amendments to Phase 3 of development within the Aderrig Development Area of the Adamstown Strategic Development Zone. The amendments are proposed to the previously permitted residential development (Reg. Ref. SDZ22A/0014, Aderrig Phase 3) and principally include the introduction of a northbound bus stop and associated shelter and infrastructure north of the junction of permitted Road 9 and the Celbridge Link Road. The amendments also include: reconfiguration of parallel parking spaces and street tree locations, including the omission of 3 No. car parking spaces to accommodate the bus stop; segregation of footpath and cycle track south of permitted Road 9 to tie in with the same arrangement permitted farther south under Reg. Ref. SDZ22A/0007; minor changes to landscaping to accommodate the amendments; and all associated site and development works above and below ground. (Separate note: the site area stated below is rounded to 0.081 by the online application system.)
Development of a section of the Celbridge Link Road (forming part of Loop Road 3) comprising the following: (i) 1220m of 7m carriageway with parallel parking bays, planting/grass verges, buffer/lighting strips, off-road cycle tracks and footpaths, linking a section of the proposed Celbridge Link Road (subject to a Part 8 application) to the proposed Adamstown Drive and Adamstown Way; (ii) new signalised junction at the intersections with Adamstown Drive and Adamstown Way and 13 uncontrolled junctions for future access to the Adamstown SDZ development areas; (iii) new public lighting for the length of the road alignment and (iv) all ancillary and associated site development and infrastructural works including surface and foul water drainage, a total of 178 car parking spaces, temporary security fencing, public lighting, junction layouts and signals, footpaths, cyclepaths, trees and planting and minor adjustments of existing drainage and services to serve road and future surrounding development all at a site located within the western section of Adamstown SDZ, on lands generally located along the proposed alignment of the Celbridge Link Road and Loop Road 3 within the Tubber Lane, Arderrig and Adamstown Boulevard development areas of the Adamstown SDZ Planning Scheme 2014. The development has a total site area of 3.06ha and is located entirely within the boundary of the Adamstown SDX as defined by S.I. 272 of 2001.
Source match
Matched from public planning record SDZ22A/0014The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report