The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ23A/0018 comprising the Clonburris Development Areas CSW-S1 and CSW-S2 of the Clonburris SDZ Planning Scheme 2019 as follows: Site A (to the north of the permitted CSLS) the proposed amendments to the permitted layout and external elevations of Apartment Block B1 to include: i. A change to the location of window / terrace door at ground floor level; ii. The swapping of a terrace door / window at ground and upper floor levels; iii. Amendment to the stair core and omission of a step-out of the external wall at ground and upper floor levels; iv. Proposed relocation of a plant room door at ground floor level on the western elevation; v. Proposed change of doorway to bicycle store at ground floor level on the western elevation; vi. Provision of 1 no. Cleaner's Store at ground floor level (c.12.4 sq.m); vii. Proposed increase in area for PV panels from c.15 sq.m to c.175 sq.m and provision of 7 no. additional Automatic Opening Vents (AOVs) at roof level; viii. Provision of 2 no. additional internal fire doors at ground floor level; ix. Amendment to 6 no. units at ground floor level to provide for Universal Access; x. The amalgamation of 2 no. Plant Rooms, as approved under the parent permission, to provide for 1 no. single Plant Room (c.86.32sq.m) and a Meter Room (c.14.19 sq.m) located to the north of the Plant Room; xi. A proposed change from green roof, as approved under the parent permission, to brown roof; xii. The lowering of the higher roof parapet level from 74.47 AOD to 73.42 AOD on the western elevation; xiii. Proposed change of finish from render to buff brick on western elevation and provision of protruded buff brick detail on upper floor levels of northern, southern, eastern and western elevations; xiv. Provision of wall mounted feature panel (3.45 sq.m) at ground floor level on the western elevation; xv. Proposed change from brick finish to render at ground and upper floor level of the western elevation; and, xvi. The omission of dark render detail at upper floor levels on the western elevation. Site B (to the south of the permitted CSLS) the proposed amendments to the permitted layout and external elevations of Apartment Block B2 to include: i. A change in window location at ground and upper floors on western elevation due to a change in apartment layout; ii. Relocation of plant room door on ground floor level on eastern elevation; iii. the provision of a new window ope at ground and upper floor levels on the northern elevation; iv. Provision of Cleaner's Store (4.79 sq.m) at ground floor level; v. Proposed change to fenestration arrangement on northern, southern, eastern and western elevations due to change in apartment layout; vi. Amendment to arrangement of stairway; vii. Provision of 2 no. additional Automatic Opening Vents and increase in area for PV panels from 30 sq.m to 132 sq.m at roof level; viii. The lowering of the higher roof parapet level from 75.32 AOD to 74.47 AOD on the western elevation; ix. The amalgamation of 2 no. Plant Rooms, as approved under the parent permission, to provide for 1 no. single Plant Room (c.59.55 sq.m) and a Meter Panel Room (c.13.82 sq.m) located to the south of the Plant Room; x. Proposed change from green roof to brown roof; xi. The omission of dark render detail on the upper floors of the eastern elevation; xii. The provision of a wall-mounted feature panel (3.91 sq.m) at ground floor level on the western elevation; xiii The lowering of brick finish to window head height on the northern, southern and eastern elevations; xiv. The omission of a canopy above the permitted entrance on the eastern elevation; xv. The provision of protruded brick details at upper floor levels on the western elevation; and, xvi. The provision of alternative render panels on upper floor levels of the northern and eastern elevations. The proposed amendments will result in an overall increase in Gross Floor Area by 35.4 sq.m to 7,722.2 sqm and will also include the relocation of an ESB substation and associated switch room to the gable end of Apartment Block 2, the reconfiguration of the existing bin, bicycle and ESB room to provide for bin and bicycle storage only and a minor amendment to car parking spaces to provide for access to the relocated ESB substation and all associated/ancillary amendments.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Within the townland of Cappagh and Clonburris Litte, Clonburris, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 3,283 nearby planning records within 5 km where a location match is available.
- Matched source
- SDZ23A/0018
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
7 year Planning Permission for development at site of c. 13.75 hectares (on 2 parcels of land consisting of construction of 565 dwellings (mixture of apartments, duplex apartments and houses) in the Clonburris Development Areas CSW-S1 & CSW-S2 of the Clonburris SDZ Planning Scheme 2019 as follows a) 230 houses comprising 1 two bedroom house, 217 three bedroom houses and 12 four bedroom houses, all 2 storey (house types H3, H4, H4S, H5, H6 - 3 no. storeys) comprising semi-detached, terraced, end terrace units (with parking, solar panels and private open space); b) 216 duplex apartments/apartments comprising 108 two bedroom units and 108 three bedroom units, in 20 no. 3 no. storey buildings (in a series of 4, 6, 7, 8 & 9 terraced blocks); c) 119 apartments as follows: Block 81 (4 storeys) consists of 72 apartments (33 one bedroom & 39 two bedroom apartments); Block 82 (4 storeys) consists of 47 apartments (17 one bedroom apartments & 30 two bedroom apartments (all apartments to have terrace or balcony); d) Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 to the east; e) Public Open Space/landscaping of c. 3 hectares (to include Grand Canal Park along the southern boundary of the site to connect to existing Grand Canal towpath) as well as a series of communal open spaces to serve apartments and duplex units; f) The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (675 spaces) and bicycle parking (998 spaces), single storey ESB substations/bike/bin stores, green roofs and solar panels at roof level of apartments, and all ancillary site development / construction works; g) Permission is also sought for provision of and connection to water supply foul drainage infrastructure; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 all on wider lands bounded generally by the Dublin-Cork railway line to the north, the Grand Canal to the south, and undeveloped lands to the east and west and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application.
Construction of 157 dwellings within the Clonburris South-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019 consisting of, 81 houses comprising of 4 two bedroom houses, 65 three bedroom houses and 12 four bedroom houses (all two storey with associated private open space and car parking; 76 apartment units consisting of 26 one bedroom and 50 two bedroom units within Block 1 (4 storeys); Vehicular access will be provided from the permitted street under SDZ21A/0022 and the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 (Fonthill Road) to the east; All ancillary site development works including footpaths, landscaping boundary treatments, public and private open space areas, car parking (170 spaces) and bicycle parking (170 spaces), single storey ESB sub-stations, bin and bicycle stores and all ancillary site development/construction works all on wider lands bounded generally by the Dublin-Cork railway line to the north, undeveloped lands and Grand Canal to the south and undeveloped lands and the Fonthill Road (R113) to the east, in accordance with the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
The construction of 569 dwellings, a creche, innovation hub and open space in the Clonburris South West Development Area of the Clonburris SDZ Planning Scheme 2019 as follows: 173 houses comprising 8 two bedroom houses, 153 three bedroom houses and 12 four bedroom houses (147 dwellings in CSW-S4 consisting of 8 two bedroom houses, 127 three bedroom houses & 12 four bedroom houses & 26 three bedroom dwellings in CSW-S3}, all 2 storey comprising semi-detached, terraced, end terrace units (with parking and private open space); (B) 148 duplex apartments/apartments {88 in CSW-S4 & 60 in CSW-S3) comprising 74 two bedroom units and 74 three bedroom units, in 16 three storey buildings. In CSW-S4 Duplex Blocks A,B,C,D,E,F,G,J,K, comprise 8 units (4 two bed & 4 three bed units), Duplex Block H comprises 16 units (8 two bed & 8 three bed units), In CSW-S3 Blocks L, N & O comprise 8 units (4 two bed & 4 three bed units), Block M comprises 14 units (7 two bed & 7 three bed units), Block P comprises 10 units (5 two bed & 5 three bed units), Block Q comprises 12 units {6 two bed & 6 three bed units), all to have terraces/pitched roof; (C) 396 apartments as follows: within CSW-S4, Block 1 consists of 172 apartments (76 one bedroom, 91 two bedroom and 5 three bedroom apartments), in a 2-building arrangement both 6 storeys in height. Within CSW-S3, Block 2 {4 storeys) comprises 16 one bedroom apartments and 22 two bedroom apartments, Block 3 (4 storeys) comprises 16 one bedroom apartments and 22 two bedroom apartments (all apartments to have terrace or balcony); (D) Provision of an innovation hub (626sq.m) and creche (c. 547sq.m) in a part 3/4 storey 'local node' building in CSWS4; (E) Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 to the east {along with provision of internal haul routes {for construction) to connect to the R136 to the west); (F) Public Open Space/landscaping of c. 4.1 hectares (to include Local Park and MUGA in CSW-S3, Grand Canal Park, along the southern and eastern boundaries of the site to connect to existing Grand Canal towpath) as well as a series of communal open spaces to serve apartments and duplex units (c. 0.39 ha); (G) all ancillary development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (656 spaces) and bicycle parking (672 spaces), single storey ESB substations/bike/bin stores, 'Gateway' entrance signage (2), solar panels at roof level of apartments, and all ancillary site development/construction works; (H) Permission is also sought for revisions to attenuation permitted under SDZ20A/0021 as well as connection to water supply, and provision of foul drainage infrastructure; this application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015; an Environmental Impact Assessment Report accompanies this planning application; the application applies for 7-year planning permission for development at this site of c. 17.02 hectares (on two parcels of land to include entrance area) within the townlands of Cappagh, Clonburris Little & Kishoge, Co. Dublin all on wider lands bounded generally by undeveloped lands and the Dublin-Cork railway line to the north, undeveloped lands and the Grand Canal to the south, the R113 {Fonthill Road) to the east and the R136 to the west.
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ2IA/0022 comprising: (i) The construction of 2 no. 2-bedroom ground floor apartments (in place of plant areas) within the permitted apartment block 1A to include terrace and all associated internal and external amendments to facade on northern and southern elevations; (ii) Replacement of render with brick to the southern, western and internal elevations of the permitted apartment block 1A; (iii) Elevational changes to permitted duplex units to replace permitted render finish with brick on external staircases and removal of relief panel strip on 2 no. side elevations; (iv) Amendments to the fenestration arrangements on all elevations of the permitted 'Local Node' building and proposed amendments to the western elevation including change of brick, replacement of render with brick and inclusion of grey brick relief panel. All on wider lands bounded generally by undeveloped lands and the Dublin-Cork railway line to the north, undeveloped lands and the Grand Canal to the south, the R113 (Fonthill Road) to the east and the R136 to the west.
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ21A/0022, and as amended under South Dublin County Council Reg. Ref.: SDZ23A/0029, relating to the local node building (Block CR) comprising of the temporary change of use of the permitted flexible community space (c.73.7 sq.) located at ground floor level within Block CR to convenience retail use, including the provision of an external bin store (8.4 sq.) and all associated site development works. The proposed change of use will exist for a temporary period of up to 5 years to facilitate retail provision in the local area. The unit will then return to its permitted community space use as approved under SDZ23A/0022.
Source match
Matched from public planning record SDZ23A/0018The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table