(i) demolition of existing substation and removal of existing advertisement structure on site; (ii) construction of a residential development of 197 apartments (79 one-bedroom, 105 two-bedroom and 13 three-bedroom) in 4 blocks (ranging in height from seven to eight storeys with eighth floor level roof garden) as follows: - Block A containing 41 apartments (6 one bedroom, 34 two bedroom and 1 three-bedroom) and measuring eight storeys in height (with eighth floor roof garden); - Block B containing 79 apartments (33 one bedroom, 34 two bedroom and 12 three bedroom) and measuring eight storeys in height; - Block C containing 42 apartments (24 one bedroom and 18 two bedroom) and measuring seven storeys in height; and, - Block D containing 35 apartments (16 one bedroom and 19 two bedroom) and measuring seven storeys in height; (iii) all apartments will have direct access to an area of private amenity space, in the form of a balcony, and will have shared access to internal communal amenities including 2 resident lounges (114.7sq.m), gym (98sq.m) external communal amenity space (1,490.8sq.m) and public open space (1,667sq.m); (iv) provision of 78 vehicular parking spaces (including 3 car-share parking spaces, 4 mobility parking spaces, and 8 electric vehicle parking spaces), 4 set-down vehicular parking spaces (including 1 mobility parking space) and 448 bicycle parking spaces (including 100 visitor parking spaces) at ground floor/ground level accessible via new vehicular entrance gate off access road off Greenhills Road; (v) provision of 4 commercial units (871.5sq.m total) and 1 childcare facility (329.7sq.m) with associated external amenity space (168.8sq.m) located at ground floor level; and, (vi) all ancillary works including public realm/footpath improvements, landscaping, boundary treatments, internal footpaths/access roadways, bin storage, foul and surface water drainage, green roofs, removable solar panels, ESB substation and all site services, site infrastructure and associated site development works necessary to facilitate the development.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands at Greenhills Road, Tallaght, Dublin 24
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 5,574 nearby planning records within 5 km where a location match is available.
- Matched source
- SHD3ABP-313590-22
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
New vehicular service yard entrance at side.
Change of use to part of the ground floor (98sq.m), from retail to medical use and changes to the ground floor elevation to include new glazed screen and doors and signage to existing facades.
Change of use to part of the ground floor from retail to medical use and changes to the ground floor elevation to include new windows and doors to the existing façade.
Extension to the front and side of the existing storage warehouse building (314.00sqm) with ancillary office space and new exterior illuminated signage to front and side and ancillary site works.
Demolition of existing factory/warehouse buildings on site (total floor area c. 10,076.8sq.m). Construction of 502 apartments (comprising 197 1-bed; 257 2-bed; and 48 3-bed units) within 6 blocks ranging in height from 4 to 8 storeys. All residential units provided with associated private balconies/terraces to the north/south/east/west elevations. Provision of residential amenity facilities, 3 retail units, creche and services/bin store areas (total non-residential floor area c.1,839sq.m). A total of 202 car parking spaces (at basement and undercroft levels) and 584 no. bicycle parking spaces. Vehicular/pedestrian/cyclist accesses from Greenhills Road and Airton Road. Provision of road improvements and pedestrian crossings. All associated site development works, open space, landscaping, boundary treatments, plant areas, pv panels (at roof level), waste management areas, and services provision (including ESB substations).
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report