Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 255 decisions within 5 km, 2 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct a rear extension to our existing commercial warehouse and all associated site development works
A) an extension to the rear of the existing warehouse, b) advertising signage to the front of the warehouse, c) internal layout changes and associated site works
The base of existing extension to the existing fabrication workshop. Planning Permission is also being sought for (i) the completion of this extension, (ii) the construction of a new workshop (iii) the construction of the new paint shop and all other site development works
(i) outbuildings and sheds and (ii) an existing extension to the existing dwelling and all associated site works
Karting track development comprising the following (ii) a building comprising changing rooms and a W.C. (ii) a building for the storing of and general maintenance of the karts (iii) the installation of an over ground gas storage tank for the refuelling of the karts (iv) perimeter fencing (v) general signage on the building described in item 1 above (vi) general signage on the perimeter fencing (vii) the change of use of the land from industrial to a karting track (viii) hardstanding of the proposed areas for karting track (ix) general lighting (x) and all other site development works
1 no. single storey light industrial building incorporating 4 no. units and 1 no. warehouse building, car parking, storm water attenuation and all associated site development works
The brief summarizes the pattern across all 255 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17601178The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief