Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 464 decisions within 5 km, 11 exact-site or onsite candidate records, and 35 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
35 structured nearby appeal records.
35 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of the final phase of the Ard Coillte housing development, approved under planning references 07/51/0573 & 08/51/0300 and extension of duration references 13/51/0027 & 13/51/0028. This phase of the development consists of 10 detached houses, 4 garages, connection to the public services, roads, footpaths, open space areas & ancillary site development works
Construction of the final phase of the Ard Coillte housing development, approved under planning references 07/51/0573 & 08/51/0300 and extension of duration references 13/51/0027 & 13/51/0028. This phase of the development consists of 10 detached houses, 4 garages, connection to the public services, roads, footpaths, open space areas & ancillary site development works
Construction of 9 detached houses, 1 garage and ancillary site works
To construct a) a single storey extension to the side and back of house and (b) new window at ground floor level on the East Elevation with internal alterations
The construction of a new entrance porch under the existing balcony, enclosing the first floor balcony to form a study, removal of the existing fireplace and chimney to install a new patio door, removal of the kitchen door to install a new window all to side elevations, installation of a new flue, together with all other associated site works
Single storey rear and side extension which incorporates the existing garage and change of use of domestic garage to residential use, hard and soft landscaping with all ancillary site works
The brief summarizes the pattern across all 464 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17601357The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief