Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 139 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Demolition of an existing two storey dwelling and to construct a new single storey dwelling with new effluent treatment system and associated percolation bed, all associated site development works including boundaries, driveway and access onto existing farm road and utilising existing entrance onto public roadway
The demolition of an existing two storey dwelling and to construct a new single storey dwelling with new effluent treatment system and associated percolation bed, all associated site development works including boundaries, driveway and access onto existing farm road and utilising existing entrance onto public roadway
The following works: construction of a new single-storey extension to the North East (side) of existing dwelling, alterations to existing elevations, alterations to existing roof, new shed to rear, relocation of existing vehicular entrance, new packaged wastewater treatment system and polishing filter and associated site boundary and site development works
A new single storey, 3 bedroom house, new entrance and driveway, new waste water treatment system, percolation area and associated site works and services
Construction of 2 no. new bovine housing units with slatted waste storage and all associated site development works
The construction of a walled doubled silage slab with all associated site development works including construction of an underground effluent storage tank
The brief summarizes the pattern across all 139 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18600009The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief