Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 105 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Single storey house, domestic garage, septic tank, percolation area and entrance - previous Planning No. 12510414
Construction of a vehicular entrance, dwelling house, domestic garage, septic tank and percolation area together with all associated site works
Completion of partially constructed property, install waster water treatment system, garage, entrance, driveway and all ancillary works
Renewal of the existing roof structure resulting in an increase in ridge height, refurbishment and alterations to the existing dormer windows; amendment to west gable elevation to reduce size of existing ground floor ope to window, demolition of existing returns and construction of 2 no. single storey extensions, demolition of existing chimneys; upgrade of existing septic tanks with 2 no. waste water treatment systems and associated percolation areas, alterations to site entrances, site levels and boundary treatments and all landscaping and ancillary works
Construction of (i) hardcore base, (ii) complete part constructed roadway with hardcore. Permission for retention for (i) agriculture entrance gateway, (ii) man-made pond, (iii) part constructed roadway (iv) removal of hedgerows, (v) hardcore base area and all associated site works
Existing domestic garage, as constructed
The brief summarizes the pattern across all 105 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600011The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief