Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 210 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The demolition of a garage, front porch, rear extension and adjoining sheds and the construction of a part 2 storey, part single storey extension, area 135m2 to the domestic dwelling and a new shed, area 16m2 to the side of house. Works include the replacement of existing windows and the application of external insulation to the original house. Associated site works include the replacement of a septic tank, landscaping works to front, rear and side of house and the building of a new front boundary wall with vehicular and pedestrian gateways, to the house. Also a new gateway to be erected at the south-west boundary of the curtilage where the public road ends and private road begins.
The Installation of floodlighting system to serve an existing 4G rugby pitch located at Rockwell College, within the curtilage of a protected structure (Rockwell College and associated structures). The proposed development will consist of 6 no.18-metre floodlighting poles, 30 no. LED floodlight fixtures, appropriate pole foundations, cabling, and associated fixtures and fittings. The system is designed to achieve a maximum average of 350 Lux, with a switch-down option for training to achieve a maximum average of 200 Lux
Entrance, dwelling house, waste water treatment system and percolation area
A proposed prefabricated biomass boiler room and ancillary wood chip silo, and all ancillary site works, which are located within the curtilage of a protected structure
Amendments to granted planning application ref: 22678 - reduce the red boundary line area, relocate the single storey dwelling, domestic garage, effluent treatment tank and percolation system, relocate site entrance and associated site works
The erection of a single storey dwelling, domestic garage, effluent treatment tank and percolation system, entrance and all associated ancillary works
The brief summarizes the pattern across all 210 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600051The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief