Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 262 decisions within 5 km, 1 exact-site or onsite candidate record, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of the construction of a 100MW battery energy storage system (BESS) with associated balance of plant, equipment and buildings including:a BESS building of 8m height, 82m length and 44m width (comprising of the ground floor a battery rack room, meeting room, contractor/storeroom, wet room, UPS room, switch gear room, WC, Transformer rooms, inverter rooms, and on a mezzanine floor a HVAC/store room); 2 no. 905m3 firewater storage tanks, an 853m3 underground surface water attenuation tank, an 1030m3 underground firewater retention tank, a 110kV electrical substation and control building of approximately 5.2m height and an access and circulation road with new junction onto the local road, footpath, 8 no. car parking spaces, 3 no. retaining wall structures up to a height of 3m and native tree and scrub planting, 3m paladin security fence, and all other associated site development works including surface water and foul drainage required to facilitate the development
The following (a) entrance signs (b) flag poles (c) illuminated golf club sign (d) two information signs
The outdoor covered seating area built on the rear south east corner of existing clubhouse
Erection of 6 no. awnings at existing driving range which will be mounted on concrete bases – and all associated site development works
(a) the alterations and demolitions already carried out out to the pre-existing commercial structures on site; (b) permission for change of use of the remaining existing structures on site from commercial to residential; (c) permission for further alterations to existing structures on site to provide two front facing flat roofed dormer windows to front facing roof lights, three rear facing roof lights, raised site boundaries with adjoining detached bungalow and the omission of the existing (recently installed) NE-facing first floor gable window; (d) permission on a much reduced footprint for a single-storey flat roofed, side and front extension for continued commercial use, now to be family run as a farm shop, with signage, similar to the original pre-existing Golden Vale dairy product retail depot; (e) permission to decommission the existing septic tank on site and provide a replacement EPA compliant waste-water treatment system on site
A) permission for the change of use of the site/structure on site from commercial to residential. b) retention for the alterations carried out to the pre-existing structure on site to convert to a detached dwelling. c) Permission for further alterations to structures on site to provide for two front facing, flat roofed dormer windows, two front facing roof lights, three rear facing roof lights, raised site boundaries with adjoining detached bungalow and the omission of the existing (recently installed) NE-facing first floor gable window. d) Permission to decommission the existing septic tank on site and to provide a replacement EPA complaint waste water treatment system on site
The brief summarizes the pattern across all 262 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600187The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief