Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 348 decisions within 5 km, 1 exact-site or onsite candidate record, and 17 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
17 structured nearby appeal records.
17 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The erection of a 36 metre high multi-user lattice telecommunications structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment cabinets, creation of new entrance access track and site works
The further continued use of an existing temporary 80m high meteorological mast and associated instruments in the townland of Brittas, near Thurles Co. Tipperary. The mast was erected on site as exempted development pursuant to Class 20(A), Part 1, Schedule 2 of the Planning and Development Regulations 2001 (as amended) which was extended for two years under Planning Ref 2460421. Permission is sought to extend this permission for a further period of two years
The continued use of an existing temporary 80m high lattice type meteorological mast and associated instruments in the townland of Brittas, near Thurles Co. Tipperary. The structure is fixed to ground mounted anchors by guy wires and includes instruments to measure local meteorological conditions. The mast was erected on site in April 2023 as exempted development pursuant to Class 20(A), Part 1, Schedule 2 of the Planning and Development Regulations 2001 (as amended). Permission is sought for a further period of two years
Carry out alterations and extension to existing dwelling including the repositioning of existing site entrance and all associated site works
Single storey extensions to dwelling house, domestic garage and all associated site works
An extension to the side of existing bungalow and all associated site works
The brief summarizes the pattern across all 348 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600549The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief