Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 42 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a new dwelling with garage, a new entrance and a treatment system with polishing filter and all associated site-works
To construct a two-storey dwelling house, entrance, treatment unit, percolation area and all associated site works
Construction of domestic garage, car port and utility room extension and permission for retention of domestic shed and permission for retention of position of entrance to site and permission to complete entrance and associated site works
The construction of a new Disinfection Kiosk (approx. 3m W x 5m L x 2.77m H),dosing chamber and all ancillary groundworks on site. The kiosk will be divided into 2 rooms – one will contain the disinfection MCC and all the water analysers, the second room will contain the chlorine day tank (approx. 300lt) and the chlorine dosing pumps at the site of the existing borehole. A new 2.46 palisade security fence will be erected around the perimeter of the site with a lockable security gate to match the fence
The as constructed development of (a) extension to dwelling house, (b) new roof over original flat roof, (c) vehicular entrance, (d) new dormer window and all associated works
Construction of a dwelling extension, the construction of a new entrance, closing an existing entrance and all associated site works
The brief summarizes the pattern across all 42 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600619The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief