Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 137 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Proposed single storey extension to side of existing community hall with all associated site works
The construction of a single storey lean-to store building on the west elevation of the existing hall with all associated site works
The following development which is in the original curtilage of a Protected Structure (Record of Protected Structures No.TRPS526, Postbox, within the Tipperary County Development Plan 2022 – 2028). The establishment of a new community park which will consist of: a) a new pedestrian bridge and partial removal of stone wall to facilitate bridge access to the park; b) new park entrance with paving, stone walls, steel arches and community notice board; c) a nature based play space incorporating site furniture, play elements, grass mounds and planted areas; d) a new gravel car park area; e) a pedestrian gravel pathway throughout the site; f) external lighting between carpark and park entrance; g) a bio-retention swale; h) tree planting, planting, landscaping throughout the site and any ancillary site development works
The construction of a new single storey Fitness Centre incorporating changing rooms, additional car parking spaces and all associated ancillary site works
Construction of a walkway at the club grounds. The walkway will be lit with LED lights on 4m poles. Car park lighting will be part of this development.
The construction of an underground slurry storage tank and yard area, with associated site works
The brief summarizes the pattern across all 137 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18600668The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief