Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 537 decisions within 5 km, 5 exact-site or onsite candidate records, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development at existing dairy processing facility consisting of 3no. main elements; 1.Re-location of main access to the dairy processing plant frm Stafford St to Kenyon St/Well Rd roundabout junction & upgrade of existing milk intake facilities with assoc. site dev works; 2.Expansion of existing casein processing plant facility; 3.Upgrade of existing WWTP; Element no.1 shall re-locate site access, a)upgrade works to existing Kenyon St/Well Rd roundabout junction;b)new security control building (approx.fl area 69sqm);c)extension/upgrade of existing milk intake facility;d)new facilities for truck cleaning with canopy roof over;e)2no. new truck weighbridges;f)demolition works to facilitate above works including demolition of the former Railway Bar & Suttons Coal Yard properties adjoining Arrabawn Co-op site & demolish of exist security control building within the site;g)all site dev works to include works to boundary walls, fencing & gates, footpaths, internal service roads & roundabout, car parks, road lighting, drainage, utility services, line marking & signage;h)construction of temp car park adjacent to Arrabawn Co-op’s head office on Stafford St. Element no.2- building extensions to existing casein plant building(approx.fl area 2586sqm) to accommodate new process plant installations to facilitate an increase in dairy processing capacity & all assoc. site works incl relocation of exist external silos, compactor & prefabricated storage unit, removal of existing external storage containers & plant, relocation of internal gateway to the mart site & works to road pavement, utility services & drainage. Element no.3 the installation of wastewater treatment tanks;a)aeration tank 22m dm x 6m high;b)settlement tank l9m dm x 5m high; c)covered sludge tank l2m dm x 5m high along with an extension to exist sludge de-watering building (approx.fl area 37sqm), construction of laboratory/office build(approx.fl area 36sqm), air blower building (approx. fl area 2l2sqm), 2no. air blower enclosure structures(approx.base areas 43sqm & 24sqm), additional plant & equipment installations along with assoc internal access Rd, site works & drainage works all within existing WWT site complex. An EIAR(Environmental Impact Assessment Report) has been submitted. These relate to activities for which an application for review of Industrial Emissions Licence (P0 791-02) is required to the EPA
Installation of 3 no. external water storage silos on site of existing dairy processing facility (the development works relate to activities for which an Industrial Emissions Licence, Reg. No. 791-02, is held)
A change of use of part of an existing single storey store building at its existing dairy processing facility; the development works will consist of the following; a) construction of a part two-storey structure within the existing store building to accommodate upgraded packaging facilities; b) building works ancillary to the above including the construction of a new internal stairwell within an existing production area which adjoins the existing store building; c) elevational changes to the existing store building resulting from raising the level of part of its roof to accommodate the above referenced two-storey structure. The development works relate to activities for which an Industrial Emissions Licence (Reg. No. 0791- 03) is held. The raised part of the roof over the existing store building will be at a height of approx. 13.8 metres above ground floor level
The part demolition of existing stores building and its replacement with a new single storey building to facilitate extension of existing cold store facilities and the provision of a loading dock facility together with all associated site works. The development works relate to activities for which an Industrial Emissions Licence (Reg. No. 791-02) is held.
The construction of a single storey electrical substation building (approx. floor area 39.5 sq. m) within the site of its existing dairy processing facility
(i) Change of use of part of former industrial manufacturing building to provide for use as 'office' including an area which was used previously as office space ancillary to the former manufacturing use of the building; (ii) minor alterations to elevations and to the existing surface parking arrangements to facilitate the proposed 'change of use' including provision of access ramps to building; (iii) provision of signage and (iv) all associated and ancillary site development works
The brief summarizes the pattern across all 537 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600821The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief