Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 139 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a two storey dwelling house, entrance, driveway, mechanical aeration unit, soil polishing filter and all associated site works
The alterations to existing site entrance at the property including boundary set back and all associated site works
(i) stable building with effluent tank to replace existing stable building, (ii) access roadway and all associated site works and demolition of stable building also required
The upgrade of the existing wastewater treatment plant, comprising of the replacement of the existing inlet pumps with new larger pumps; the decommissioning of the existing inlet works; the construction of a new inlet screening works area with greater capacity than existing inlet screening works, anoxic and aeriation tanks, a clarifier, a stormwater storage tank, a new chemical dosing system consisting of 2 no. above-ground storage tanks and associated equipment, a kiosk to house control equipment and a flow splitting chamber (all above ground); the construction of a new ESB MV substation and customer switch room building; and ancillary development including the widening of the existing vehicular entrance to the facility from the access road, the provision of new internal concrete roadway, footpaths and hardstanding areas, associated underground chambers, cabling and piping, internal site lighting, fencing, site landscaping and all associated site development works. The associated development works will include the creation of an approx. 1,250m2 floodwater compensatory storage area and the raising of approximately 2,740m2 of lands for flood prevention purposes at the WWTP extension site. A Natura Impact Statement has been prepared in respect of this planning application
Construction of a dwelling house, garage, entrance, driveway and all associated site works.
An extension to the rear of our existing dwelling including associated site works
The brief summarizes the pattern across all 139 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600863The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief