Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 446 decisions within 5 km, 2 exact-site or onsite candidate records, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct(1) topless cubicles with underground effluent tank (2) silage slab with dung stead and tyre area and all associated site works. Demolition of existing silage slab and yard also required
(I) extension to roofless cubicles with underground effluent tank (II) Loose shed and all associated site works
Extension to existing shed
A 10-year permission for the development which will consist of the phased extension of the existing food manufacturing facility comprising: 1) construction of an 11,267 m² extension to the existing food manufacturing facility, including: (a) cold storage areas; (b) two-storey office space, toilet block, and drivers’ area; (c) new processing, packing, intake/dispatch areas; (d) electrical plant, maintenance rooms, and external steel access staircases; (e) new gas tanks, transformer compound, and pipe bridge; 2) construction of an 1,500 m³ storage building for packaging and machinery; 3) extension of existing wastewater treatment plant (WWTP) buildings (primary: 107 m², secondary: 250 m²); 4) construction of an 110 m² waste collection building; 5) extension to the existing water treatment plant (WTP) building (70 m²); 6) expansion of the high temperature (HT) plant room (64 m²); 7) construction of 4 no. tanks; 8) installation of 3 no. bunded kerosene tanks (50,000 L each); 9) construction of a 16 m high boiler stack; 10) construction of new internal access roads (c. 8,825 m²); 11) creation of a 520 m² internal courtyard area; 12) construction of a 630 m² external storage compound; 13) construction of a 3,120 m³ stormwater attenuation pond and discharge line; 14) installation of a standby treated effluent discharge pipeline (1,490 m); 15) realignment and expansion of site boundary, including new boundary walls, fencing and planting; 16) provision of an additional 8 no. truck parking spaces; 17) relocation of the existing fuel tank and weighbridge; 18) expansion of the existing sprinkler pump house (24 m²); 19) conversion of 22 no. existing car spaces including 1 no. accessible space to 22 no. EV car spaces as required and provision of 30 no. bicycle parking spaces; 20) installation of new site lighting; 21) demolition of existing buildings and structures (total 1,840 m²); and 22) all ancillary site development works and services to facilitate the development including drainage, landscaping, temporary construction compound and utility connections. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been submitted to the planning authority with this application
1) Extended Intake Freezer & Access Lobby, new Vacuum Pumphouse, new Smoke House, extended Tumbling Area including Overhead Mezzanine Area and relocated Stair Core, extended Spiral Freezer Room, extended Plantroom including Overhead Mezzanine Area and extended Waste Collection Loading Bay Area to that originally granted under Planning Application No. 17600374; 2) Extended 1st floor area over existing Loading Bays consisting of an external Smoking Area to that originally granted under Planning Application No. 18600753; 3) A 1st floor Solar Farm Switchroom extension over an existing Ground Floor Switchroom at the rear of the site; 4) Extended enclosure for Waste Collection at the rear of the site; 5) The redesign & relocation of the stand-alone two storey Administration Building onsite including a revised car parking layout at the front and rear of the same building to that originally granted under Planning Application No. 11510456; 6) and all other ancillary site works/services;
Construction of a new 1 no 1, 200m3 water tank, construction of a new single storey process water treatment building, the relocation and extension of an existing single storey mild steel workshop, the construction of a new single storey stainless steel workshop, an extension to the existing boiler house, the construction of an internal access road, additional site lighting and all ancillary site works/services
The brief summarizes the pattern across all 446 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600876The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief