Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 249 decisions within 5 km, 7 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A new temporary single story detached accommodation unit for use as 6 no temporary classrooms and associated toilets, to be erected in two phases of 3 classrooms, including all associated site works
The conversion of a portion of the existing ball alley building for use as a canteen & gym, installation of a new second floor and associated internal alterations, new windows, together with all associated incidental and site works
The construction of a 1, 2 & 3 storey extension with a total floor area of 3,508m² comprising: 13 no. classrooms, 8 no. specialist classrooms, 1 no. SET room, a 2 classroom SEN unit with direct access to own outdoor play area & sensory garden, all necessary ancillary spaces, the installation of roof mounted solar PV panels, ASHP, 2 no. static water storage tanks (below ground), the demolition of 1 no. lean-to store (34m²) & 1 no. single storey prefab (162m²), the removal of a 1 & 2 storey prefabricated classroom block (1,042m²) together with site works comprising: alterations to lower the existing front boundary wall (for the extent of the proposed extension) and formation of a new pedestrian entrance, adjustments to the existing staff car parking layout and the addition of new car & bicycle parking (with shelter) to the front of the existing main school building, all associated drainage & site development works, and improvements to the 2 no. existing vehicular entrances onto Black Road along with the provision of a temporary construction access onto the Black Road
Changes to Phase 2 of works (previously approved under Planning Ref 18600877) comprising the following: revised layout shape and size, revised elevations and all associated site boundary and site development works
A two storey extension to the rear of the existing dwelling and all associated site works
4 no two storey dwellings and all ancillary site development works previously Ref No 15/600567
The brief summarizes the pattern across all 249 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18600877The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief