Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 418 decisions within 5 km, 1 exact-site or onsite candidate record, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) the construction of a pathway including a section of boardwalk and (b) the erection of six 6ft by 3 ft information signs. The site of proposed developments is located within a Special Area of Conservation and an Appropriate Assessment Screening Report has been completed and submitted with the application.
A single storey extension to existing dwelling, re-alignment of existing agricultural entrance to serve as new main vehicular entrance to the property, new wastewater treatment system to replace exsiting septic tank, detached garage and all associated site works
A) construction of part two-storey, part single storey detached dwelling, b) detached garage, c) new site entrance, d) new bored well, e) new waste water treatment system and percolation area, f) all associated site works
Single storey detached dwelling, single storey detached garage, site entrance, waste water treatment system and percolation area and all associated site works
The construction of a new dwelling house, effluent treatment system, works to existing entrance together with all associated site works
A) an existing shed at the rear of the site, b) a prefab structure to the rear of the site, c) an extension to the rear of existing dwelling and all associated siteworks
The brief summarizes the pattern across all 418 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600968The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief