Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 160 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Alteration, extension and renovation works to dwelling house and the erection of a domestic shed
Alteration, extension and renovation works to our dwelling house and the erection of a domestic shed
Demolition of an existing dwelling and construct a new dwelling, wastewater treatment system/percolation area, driveway, alterations to existing site entrance and all associated works
To construct a dwelling house, entrance, septic tank together with all associated site works
The following: a) to demolish existing dwelling and outbuildings, b) to construct replacement dwelling with garage and wastewater treatment system and relocate existing entrance to improve sightline with all associated siteworks
To construct a dwelling house with garage, utilize existing entrance, effluent treatment system together with all associated site works
The brief summarizes the pattern across all 160 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600976The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief