Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 764 decisions within 5 km, 3 exact-site or onsite candidate records, and 58 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
58 structured nearby appeal records.
58 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct a vehicular gated entrance and hardstand area to the front of existing dwelling, dished kerbs on public footpath and all associated site development works
Construction of a single storey extension to the rear of my existing dwelling and all associated site development works including demolition of the existing shed and modifications to the existing dwelling
Demolition of the existing fuel storage shed and construct a single-storey extension to the rear of the existing dwelling and associated site works, the extension will consist of a walk-in shower room/WC
Construction of a single storey extension to the rear of my existing dwelling and all associated site development works including minor modifications to the existing dwelling
Construction of a single storey extension to the rear of my existing dwelling and all associated site development works including minor modifications to the existing dwelling
Construction of (1) front porch, (2) extension to gable end, (3) extension to rear, (4) enlargement of existing entrance to driveway with height increase of existing front boundary wall to 1.2m, (5) alterations to front and rear windows in existing facades and internal modifications, (6) demolition of existing coal shed and any repairs to boundary wall caused by same, along with necessary ancillary works all on our site
The brief summarizes the pattern across all 764 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18600985The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief