Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 110 decisions within 5 km, 9 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The erection of extensions and alterations to existing dwelling comprising of a single storey ground floor extension, a first floor extension over existing lean-to roofed single storey extension, skylights to existing attic roof storage space and all associated site works all to the rear of the dwelling
(A) the change of use of part site area to commercial shop storage, new entrances in rear boundary stone wall and associated concrete hardstanding. (B) site clearance and removal of rubble from collapsed structure. Planning permission for (A) a new boundary fence and gates of steel and timber construction, domestic garage / store of steel frame and cladding and associated hard standing area and all necessary services. This is within the curtilage of a protected structure ref S537
Extension and alterations to existing derelict house and associated site works
Change of use of existing commercial hairdressing and beauty treatment salon to domestic dwelling
The construction of landscaping, re-surfacing and storm drainage works. The development includes works on the site of the listed building ref TRPS1066
Construction of a) A Community carpark to the rear of St. Mary's Church with circulation road and front gate, access footpaths, public lighting and site boundary fencing b) Widening of portion of site access roadway including adjustments to associated boundary walls c) Localised alteration to stone boundary wall of the old Schoolhouse d) Road markings and signage e) All associated site development works including drainage, storm attenuation, and service ducting. The development includes works on portion of listed building sites Ref. S047 St. Mary's Church, Ref S050 St. Marys National School, and is bounding listed building site Ref. S049 Bailey House Nursing Home
The brief summarizes the pattern across all 110 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18600992The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief