Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 293 decisions within 5 km, 3 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Alterations to previously approved site entrance, front site boundary wall and associated site works (ref: 15601124). Retention of pump house
(a) Retention for pavillion concrete base to rear of property (b) Permission for a single storey metal clad pavillion/storage building to rear of property and associated site development works
To retain entrance, front boundary wall, window on eastern elevation of dwelling, domestic garage, boiler house and position of dwelling on site
The construction of an extension at rear of house, for comprising family room at ground floor level and storage space at first floor level, and all associated site and ancillary works
1) single storey extension to rear and side 2) minor modifications to existing elevations 3) the development will include all associated drainage, site development and landscaping works
To construct an external connection corridor (along rear of existing dwelling house to the side of existing "Granny-Flat") and for retention permission for the existing "Granny-Flat" to the side of the existing dwelling house and all ancillary works
The brief summarizes the pattern across all 293 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18600994The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief