Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 50 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
No current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
One permanent meteorological mast 35m in height and associated infrastructure
To relocate entrance, renovate existing dwelling, construction of a new single storey extension, new septic tank, percolation area and all associated site works
The construction of an entrance, dwelling house, garage, private well, septic tank & percolation area together with all associated site works
The amendments to Upperchurch Windfarm Electrical Substation authorised under An Bord Pleanála Ref. No. Pl.22.243040 and PA92.310171. The amendments consist of a) increase in size of the substation compound yard; b) change to the layout of electrical equipment in the substation compound yard; c) change in size, design and increase in height of the two control buildings and d) ancillary works. The application is accompanied by an Appropriate Assessment Report (stage 1 – screening) and screening for Environmental Impact Assessment (EIA) report
Amendments to Upperchurch Windfarm Electrical Substation, authorised under An Bord Pleanala ref no PL.22.243040; Tipperary County Council REF: NO. 13/510003. The amendments consist of: a) Increase in size of the Substation compound yard; b) Change to the layout of Electrical equipment in the substation compound yard; c) Change in size, deisgn and increase in height of the two Control Buildings and d) Ancillary works. The application is accompanied by an Appropriate Assessment Report (Stage 1 - screening) and screening for Environmental Impact Assessment (EIA) Report
To extend and renovate existing house and shed, upgrade wastewater treatment system and entrance along with all ancillary site works
The brief summarizes the pattern across all 50 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18601014The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief