Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 170 decisions within 5 km, 2 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To demolish a derelict haybarn and to construct a Cubicle House, Slurry Lagoon, Extension to Milking Parlour, Holding Yard with Effluent Channel and ancillary works
(i) soiled water tanks (ii) slatted shed with underground slurry tanks (iii) silage pit (iv) calf shed with effluent tank and all associated site works
The following in relation to 'concrete fair' commercial fabrication facility to include retention permission for existing fabrication workshop, permission for the following proposed developments to include extension to fabrication workshop, storage shed, office, and staff facilities and foul water treatment system and percolation area. Reconfiguartion of entrance and road boundary and all necessary services and site works
Existing workshop, as constructed drainage system, entrance and all associated site works
Installation of approximately 21.6kW (130.8m2) of solar PV panels on the roof of an existing apple packing shed and 21.6kW (130m2) of solar PV panels on the roof of an existing apple storage shed
Construction of an apple storage shed to infill the space between existing sheds and to erect solar panels on the new south facing roof elevation and to erect solar panels to the south facing roof elevation of existing general storage shed, all with associated site works
The brief summarizes the pattern across all 170 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18601041The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief