Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 189 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1. Demolition of existing conservatory and rear wall to the rear of existing dwelling. 2. Construction of a first floor extension to the rear of existing dwelling. 3. To extend and re-roof existing kitchen, bathroom and bedroom. 4. Including all associated site development works to facilitate the proposed development
Existing side extension to dwelling
Extension to sides of existing house and all associated site works
Dwellinghouse, new entrance, septic tank with standard percolation area and all associated site works
Amendment to the design of the previously approved development (Planning Reference: Tipperary County Council (16/600917) and An Bord Pleanála (Pl92.249060), which comprises consent for a Solar PV Energy Development and for planning permission for a proposed Battery Energy storage system - amendments include; (1) changes to the configuration of the Solar PV rows, (2) a reduction in the height of the solar PV panels, (3) reduction in the spacing of Solar PV rows (strings), (4) increase in size of solar panels, (5) increase in solar panel output resulting in an overall increase in solar power generation, (6) a change in solar panels tilt (degree), (7) an increase in the number of transformers/inverters, (8) an increase in the area of the individual transformers, (9) an increase in the number of panels, (10) the introduction of a Battery Energy Storage system with a compound size of 5,400 square metres containing 60 battery units and 30 inverter units, all of which measure 6.1 m in length, 2.45m in width and 2.9m in height, together with a switch room/SCADA room - A Natura Impact Statement will also be submitted with the application
Amending the design of the previously approved development (Planning Reference: 19601323, Tipperary County Council) which comprises consent for a 10 year period to construct and a 40 year period to operate a 29.09 hectare Solar PV Energy Development at Derrymore Townland, Roscrea, Co Tipperary. The proposed amendments include; (1) changes to the configuration of the Solar PV rows, (2) reduction in the height of the Solar PV panels, (3) slight increase in the bottom height of the Solar PV panels, (4) reduction in the spacing of Solar PV rows (strings), (5) increase in size of solar panels, (6) increase in solar panel output, (7) a change in solar panels tilt (degree) and (8) a decrease in the number of solar panels. A Natura Impact Statement will also be submitted to the Planning Authority for this proposed development
The brief summarizes the pattern across all 189 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18601052The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief