Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 184 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct milking parlour, collecting yard, drafting area, dairy, meal bin and all associated site works
A) a new single storey detached dwelling, b) new detached garage, c) reconfiguration of existing vehicular entrance, d) new connection to existing public utilities, e) new waste-water treatment system and percolation area, f) all associated site works
(i) Extension constructed to Eastern Gable of Dwelling; (ii) roof-light to Front (South) of Dwelling and (iii) detached storage shed to East of Dwelling
Provision of Floodlighting to (1) All weather pitch and (2) Perimeter Walkway
1) a 2 storey extension to the rear of existing 2 storey house, 2) additional floor area to existing front porch and refurbishment of existing dwelling house including revised fenestration, 3) demolition of existing flat roof rear kitchen extension and existing separate garage structure, 4) proposed new septic tank and percolation area and 4) all associated site works to facilitate the development
Construction of a single-storey extension to the front and side of the existing school building, comprising a mainstream classroom with ancillary facilities, a resource room, store room, office, entrance lobby & corridor, associated site drainage and development works including re-positioning of the pedestrian entrance to the school. This project will be carried out on a phased basis
The brief summarizes the pattern across all 184 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18601072The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief