Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 83 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of new entrance from public roadway onto forestry lands, to comprise the provision of splayed access, clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage, fences, finished hardcored structure to access area and all associated siteworks
Construction of a bungalow dwelling house, domestic garage, entrance, waste water treatment and disposal system, well and all associated site works
Construction of an underground effluent tank with slatted cubicle unit and to carry out all associated site works on lands
To construct a side and rear extension to existing dwelling house, it is also proposed to upgrade existing septic tank and install a new effluent treatment system together with all associated site works
The upgrade of an existing agricultural entrance into a forest road bellmouth to facilitate a timber harvest and haulage operation
1) the construction of a new percolation area to service the existing septic tank system. RETENTION PERMISSION for 2) the existing septic tank, 3) domestic extensions to the rear of the existing dwelling house, and to the side of the dwelling house to link an outhouse to the dwelling house, 4) the conversion/change of use of the outhouse to living accommodation associated with the dwelling house, 5) an extension to the outhouse now converted to living accommodation associated with the dwelling house, 6) the construction of additional windows to the original dwelling house, and including all associated site development works
The brief summarizes the pattern across all 83 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18601168The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief