Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 170 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retain indefinitely an extension to the rear of my dwelling house to include 2 no. velux roof windows and a window at 1st floor attic area to the end gable of the extension and associated works
(1) a mobile home (presently cladded in timber as to appear as a log cabin), (2) two outbuildings and the use of same as a domestic storage, (3) a septic tank and percolation area, entrance & driveway plus all associated site works. PLANNING PERMISSION for a new external cladding with plaster finish to the mobile home
A mobile home now cladded in timber as to appear as a log cabin, two outbuildings and the use of same as domestic storage, septic tank and percolation area, entrance and driveway plus all associated siteworks
A mobile home (temporary for 5 years) now cladded in timber as to appear as a log cabin, two outbuildings and the use of same as domestic storage, septic tank and percolation area, entrance and driveway plus all associated siteworks
1) the refurbishment and extension of existing derelict dwelling house, 2) the installation of new wastewater treatment system, 3) the demolition of existing roadside agricultural building, 4) the upgrade of the existing vehicular entrance and all site development works for the above
House extension, domestic sheds, associated entrance, septic tank, dormer windows
The brief summarizes the pattern across all 170 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18601264The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief