Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 758 decisions within 5 km, 7 exact-site or onsite candidate records, and 58 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
58 structured nearby appeal records.
58 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The erection of 3 no. retail warehouses (total gross floor area of 2100m2), parking and all associated works
Amendments to the retail warehousing development permitted under planning permission reference 13/550033 to provide a retail warehouse unit with a floor area of 1275m2, for the remainder of the permitted retail warehousing floorspace (425m2) to be used as a Class 5 warehouse with a retail trade counter, changes to the permitted elevational details including the roof profile, signage, and amendments to the wording of Condition 1 and Condition 23 of 13/550033 regarding ancillary non-bulky comparison sales and all associated works
The change of use to warehouse with ancillary trade counters (for the sale of building related products principally to trade). Proposed external works include the following amendments to east elevation comprising erection of 1 no. fixed bollard and 1 no. removable bollard in front in front of southern shuttered opening; create a new opening and install a steel clad fire door exit; install 7 no. D-hoop protection bars; create a new opening in front elevation and install a double aluminium framed clear glazed door and erect 1 no. removable bollard in front of this door and erection of 1 no. fixed bollard and 1 no. removable bollard in front of northern shuttered opening. West elevation: create a new opening in wall and install a steel clad fire door exit. North elevation: create a new opening in wall and install a steel clad fire door exit; erect 3 no. external condenser units surrounded by a cage. Includes three signage zones
An extension to existing building and facade materials alterations, facilitating a new reception area and office/accessible wc and all associated site works.
A single storey extension to the existing retail store. The gross internal floor area will increase from c1208m2 to c1847m2 (c439m2 gross). Other works include closing the existing entrance on the east elevation and providing a new customer entrance on the south elevation, removing the existing loading entrance door on the south elevation and infilling with block work to match existing, provision of additional car parking and circulation, bicycle storage shed, new and repositioned signage fencing and all associated site works
Indefinite retention of signage on shop unit
The brief summarizes the pattern across all 758 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18601414The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief