Executive snapshot
5% of nearby decided applications were refused. The site check found 757 decisions within 5 km, 9 exact-site or onsite candidate records, and 57 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
57 structured nearby appeal records.
57 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The following works: erection of raised-letter signage to South (front) and West (side) elevations
Changes to previously approved Planning Permission (Ref. no. PA 29/03) comprising of the omission of two designated car-parking spaces for existing office
Construction of a two storey extension to the rear of the existing building and all associated site works
The construction of a two storey extension to the rear of the existing building and all associated site works
Retain indefinitely 1) the change of use of part of the first floor of No. 9 Bolton Street from residential to public house restrooms 2) cold store in rear yard 3) walls in rear yard
The demolition of existing buildings on site including the eastern boundary wall and southern boundary treatments. The boundary walls along with north and west sides of the application site will remain. The memorial located at the south east corner of the site will remain and would be set into a wider landscape plaza. A plaque on the western boundary wall will, if necessary be moved to a public location on the same wall where it is visible to the general public. The construction of a mixed used development including Building A – a single storey discount foodstore with of sales license area and gross floor area (GFA) of 2,220sqms; Building B – single storey restaurant/Café 210sqms GFA; with external seating area; and Building C – two storey building with retail of grounds floor 117sqms and offices hub on first floor 209sqms; ESB substation building 22.75sqms GFA; mechanical plant area to the north of the foodstore. The development also includes a new vehicular access on Queen Street with a right hand turn lane; the inset of the existing bus stop to an off road position; the creation of a public plaza to the south of the foodstore including all soft and hard landscaping features; landscaped walkway along the eastern boundary of the site; 142 vehicle parking spaces including 2 electric vehicle parking spaces (20% of all parking spaces will be ducted for future EV parking); 96 cycle parking spaces (both covered and uncovered); covered trolley and cycle parking bay next to foodstore entrance circa 53sqm. The development includes all drainage and sustainable urban drainage infrastructure. Solar photovoltaic panels on the roof of the foodstore; all signage including a branded “flagpole sign” at the proposed vehicle entrance. All associated works to complete the development
The brief summarizes the pattern across all 757 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18601441The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.