Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 306 decisions within 5 km, 2 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolish existing dwelling and build a replacement 2 storey dwelling using existing shared entrance, install waste water treatment system including associated site works
(1) a domestic shed (2) a domestic garage, including all associated site works
A cattle underpass under the R691, together with ramps, effluent storage tank and ancillary works
A 10 year planning permission for development consisting of the construction of a solar PV development on a c129 ha site consisting of: - The erection of solar panels on ground-mounted galvanised steel frames, string inverters attached to selected ground-mounted galvanised steel frames, 16 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; - 6 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; - the installation of underground cables, including cables under public roads; - 2 no. temporary construction compounds; and all associated ancillary development works. The operational lifespan of the solar PV development will be 40 years. A Natura Impact Statement will accompany the planning application
A single-storey extension to the side of the existing dwelling house, together with associated elevational changes, drainage connections and all ancillary works
A development at their dwelling to include the following: 1) Single Storey extension to front and side of existing dwelling. 2) Modification to dormer windows to front. 3) The development will include all drainage, site development and landscaping works
The brief summarizes the pattern across all 306 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18601476The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief