Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 290 decisions within 5 km, 1 exact-site or onsite candidate record, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct an external connection corridor (along rear of existing dwelling house to the side of existing "Granny-Flat") and for retention permission for the existing "Granny-Flat" to the side of the existing dwelling house and all ancillary works
The construction of an extension at rear of house, for comprising family room at ground floor level and storage space at first floor level, and all associated site and ancillary works
Alterations to previously approved site entrance, front site boundary wall and associated site works (ref: 15601124). Retention of pump house
(a) Retention for pavillion concrete base to rear of property (b) Permission for a single storey metal clad pavillion/storage building to rear of property and associated site development works
The construction of a light engineering facility, including workshop with attached 2 storey buildings consisting of plant room, mechanical room, store, electrical room, ancillary toilets, canteen, locker room and offices. Other works as part of the development include new access road continuing from existing business park access road to serve the site, car parking, storm attenuation tank with hydro-brake, connection to public foul and storm water systems, landscaping, boundary treatment, signage and all associated site works
To retain entrance, front boundary wall, window on eastern elevation of dwelling, domestic garage, boiler house and position of dwelling on site
The brief summarizes the pattern across all 290 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18601547The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief