Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 124 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of detached single storey dwelling, onsite waste water treatment system, new entrance, connection to necessary services, boundary treatments together with all associated site works
1) Construction of a concrete hurling ball wall, associated catch netting, all weather astroturf surface, and installation of 2no. 10m lighting columns complete with 2no. LED floodlights on each column to illuminate the ball wall to the north western corner of existing playing pitch; 2) Installation of 6no. 15m lighting columns complete with 2no. LED floodlights on each column to illuminate existing training pitch to the northern end of existing sportsfield; 3) Installation of 6no. 6m lighting columns complete with LED lights to illuminate existing perimeter walkway, including all ancillary civil and site works thereto
(i) single storey dwelling as constructed, (ii) septic tank and percolation area, (iii) shared entrance with neighbouring dwelling and planning permission to complete dwelling as granted planning permission by Tipperary County Council under planning reference no. 04/51/1888 and all associated site development works
The erection of an agricultural structure containing a milking parlour and ancillary accomodation, with adjoining yards and meal silo, including asociated site works
The construction of a walled silage base and the construction of an underground effluent storage tank and feed area to serve an existing livestock shed, including associated site works
(i) Single storey dwelling as constructed (ii) septic tank and percolation area (iii) shared entrance with neighbouring dwelling and planning permission to complete dwelling as granted planning permission by Tipperary County Council under planning reference 04/51/1889 and all associated site development works
The brief summarizes the pattern across all 124 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18601550The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief