Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 625 decisions within 5 km, 1 exact-site or onsite candidate record, and 47 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
47 structured nearby appeal records.
47 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The installation of 29.7 sq.m of photovoltaic panels (eighteen in number in two rows of nine) on the front roof south, of a domestic dwelling
The house with extension at each end, stores/stables behind the house as existing and in their existing positions, stone masonry wing walls and piers at the entrance gates. Planning permission no. P3 3943 refers to this property
The construction of a 4-bedroom, detached dormer dwelling, proprietary wastewater treatment system, new vehicular entrance, and all associated site development and boundary treatment works necessary to facilitate the development
Construction of a dwelling, driveway, septic tank/percolation area and all associated works
Existing garden room to front of house and Permission for renovation and extension of existing storey and a half detached dwelling to include, (a) demolition of existing sunroom side extension (b) construction of two storey front and side extensions (c) construction of first floor dormer to rear (d) window and door alterations, internal modifications and all associated site works and services
The demolition of existing extension and shed, new single storey extension to existing dwelling, new waste water treatment system to replace existing septic tank, detached garage together with all associated site works. In addition, Retention permission is also sought for re-alignment of existing site entrance to serve as new main vehicular entrance to the property.
The brief summarizes the pattern across all 625 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600116The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief