Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 257 decisions within 5 km, 4 exact-site or onsite candidate records, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The provision of three battery storage containers which are required for the operation of the previously granted solar farm (Reg. Ref.16/600465). This planning application also includes an extension to the operational permission of the solar farm to be increased from 25 to 30 years
Alterations to the previously granted solar farm (Tipperary County Council Reg Ref 16600465 as amended by Tipperary County Council Reg Ref P19600119). Permission was originally granted for a solar photovoltaic installation comprising up to 32,000 m2 of solar panels on ground mounted frames, 4 no. inverters in 2 blocks, 1 no. kV substation, fencing, access track, CCTV and all associated ancillary development works and services. Permission was subsequently granted for the addition of 3 no. battery storage containers and extension to the operational period of the solar farm from 25 years to 30 years under Tipperary County Council Reg Ref. 19600119 and An Bord Pleanala Ref. ABP-305222-19. Permission is now sought for the following: increase the area of solar panels from up to 32,000 m2 to up to 37,641 m2, increase in height to the permitted solar panels from 2.72m to 2.82m and Permission to increase the operational period of the solar farm from 30 years to 35 years
Dwelling, Garage, Effluent Treatment System, Entrance and all associated site works
A single storey dwelling and detached domestic garage as constructed
To construct a dwelling house, domestic garage, effluent treatment system and percolation area, entrance and all other associated site works.
The construction of a 1.5-storey extension to the rear of the dwelling, to construct a porch and dormer windows to the front elevation, convert attic to domestic use and all associated site development works
The brief summarizes the pattern across all 257 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19600119The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief